SEMSWA Website

Home

About SEMSWA

Stormwater Basics

What We Do

Who We Serve

Who We Are

Our History

Bids Proposals Contracts

Board Meetings & Calendar

Fees

Credits

Stormwater Fees

SDF & ECF

Review and Permit Fees

Floodplains & Flooding

Am I in The Floodplain?

Flood Safety

Regulations & Permitting

Our Projects

Before & After Gallery

CIP Projects

Stormwater Master Plans

Maintenance Projects

Permits

Floodplain Permit

GESC Permit

Public Improvement

Programs

Capital Improvement (CIP)

Water Quality Program

Floodplain

Maintenance

Master Planning

Land Development

GIS

Resources & Downloads

Manuals & Templates

Mapping Resources

Budget & Annual Reports

Water Quality

Overview

Education and Outreach

Illicit Discharges

Construction / GESC

Post Construction

Pollution Prevention

Grant Program

External Links

Job Opportunites

Contact Us

Floodplain Regulations & Permitting


General Information

In order to obtain a Floodplain Development Permit (FPDP) a determination of the impact from the project to the floodplain must be made.  SEMSWA issues FPDPs within the City of Centennial and unincorporated Arapahoe County. FPDPs are required for all activities in the floodplain. Section 5.6.1 of The City of Centennial Stormwater Management manual states "A Floodplain Development Permit is required for any development proposed in the Floodplain." FEMA defines development as “any man-made change to improved or un-improved real estate, including but not limited to buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations, or storage of equipment and materials.” The Floodplain Development Permit is required prior to issuance of a building permit, issuance of a street cut or right-of-way use permit, issuance of a GESC permit, issuance of a public improvements permit, and any other development, use or change of the use of land located in the Floodplain. The Floodplain Development Permit is required in addition to other permits or review processes, which may be associated with the underlying zone district. All activities, regardless of impact, need to be permitted. Even when it is apparent that there are no adverse impacts to the floodplain, a permit is required for administrative purposes to ensure that SEMSWA is aware of the activities within the floodplain and that they have been evaluated for compliance with the City’s requirements.  For more information on Floodplain Development Permits, see Section 5.6 of The City of Centennial Stormwater Management Manual and Section 5.6 of the Arapahoe County Stormwater Management Manual. 


Analysis of the Impact or No Impact to the Floodplain

  • To determine whether or not the proposed project will cause an impact on the floodplain may entail a Floodplain Modification Study or Conditional Letter of Map Revision (CLOMR).
  • If the proposed project will not cause an impact to the floodplain, then a No Impact Floodplain Development Permit (FPDP) would be required. 
  • If the proposed project will cause an impact to the floodplain, a standard FPDP will be required.
  • If the proposed project will cause an impact to a FEMA regulated floodplain, a Conditional Letter of Map Revision (CLOMR) will be required to be submitted and approved by FEMA priorto approval of the FPDP. - See CLOMR and LOMR checklists

Floodplain Development Permit (FPDP)

SEMSWA's Floodplain Program issues Floodplain Development Permits for projects in and around the 100-year floodplain. To download a permit and additional documents CLICK HERE.

  • Arapahoe County Floodplain Development Permit - To be used for all proposed projects located in the floodplain within Arapahoe County
  • City of Centennial Floodplain Development Permit - SEMSWA Sections (.doc) - To be filled out by the SEMSWA Floodplain Department
  • City of Centennial Floodplain Development Permit - Terms and Conditions & Applicant Sections (pdf) - To be used for all proposed projects located in the floodplain within the City of Centennial
  • SEMSWA Application for Review (.doc) - To be submitted for all floodplain projects located within SEMSWA's Jurisdiction

Checklists

  • Floodplain Modification Study and Conditional Letter of Map Revision (CLOMR)
  • Letter of Map Revision (LOMR) No CLOMR
  • LOMR Following CLOMR
  • LOMR As-Built Drawing Checklist

SEMSWA's Floodplain Regulations and Permitting Requirements follow Federal and State criteria and are authorized through the City and County's LDC and are described in detail in the City of Centennial and Arapahoe County's Stormwater Management Manuals.    

FEMA

  • Code of Federal Regulations (CFR) 44 for FEMA Requirements

Colorado Water Conservation Board

  • Rules and Regulations for Regulatory Floodplains in Colorado

Arapahoe County

  • Land Development Code - Section 12-2000 Floodplain Management and Flood Damage Prevention Regulations
  • Stormwater Management Manual - Chapter 5 Floodplain

City of Centennial

  • Land Development Code - See Article 7 Open Space, Floodplain Management, and Environmental Quality
  • Stormwater Management Manual - Chapter 5 Floodplain